Alblasserwaard

1. Pilot description

1.1 Pilot manager authority

1.2 Pilot location

1.3 Area description

1.4 Flood risks

2. Pilot objective/goal

3. Implementation process

3.1 Point of departure of FRM strategies

3.2 Key actors

3.3 Main activities

4. Project outcomes and beyond

4.1   Main outcomes

4.2  Key actors and their roles

4.3  Flood risk management strategies (FRMS)

4.4   Lessons learnt so far

·        Knowledge needs for flood resilience:

·        Related to content:

o  Applying MLS approach
o  Methods / techniques / tools applied to learn about vulnerabilities
o  Methods / techniques to learn about impact on systems
o  Methods / techniques community involvement
o  Main uncertainties / challenges encountered
·        Related to the decision making process of adaptive planning
o  (structural) barriers encountered through the implementation process

4.5  Dissemination and upscaling of pilot results

4.6 Transnational exchange

·        Protection

·        Pro-action/prevention

·        Preparedness & response

·        Recovery

5.    References



}

























Country: The Netherlands
Coordinate 51° 52' 23.99" N, 4° 48' 2.99" E
Pilot manager authority: Province of Zuid Holland
Objective:
  • A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS.
  • By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved.
  • How can citizens / volunteer organizations play a role in emergency response?
Flood risk: Riverine.

The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level.

Stakeholder(s):
Bezig met het laden van de kaart...