Alblasserwaard

1. Pilot description

[null 1.1] Pilot manager authority

[null 1.2 Pilot location]

1.3 Area description

1.4 Flood risks

2. [null Pilot] objective/goal

3. [null Implementation process]

3.1 Point of departure of FRM strategies

3.2 Key actors

3.3 Main activities

[null 4. Project outcomes and beyond]

[null 4.1   Main outcomes]

4.2  Key actors and their roles

4.3  Flood risk management strategies (FRMS)

[null 4.4   Lessons learnt so far]

·        Knowledge needs for flood resilience:

·        Related to content:

o  Applying MLS approach
o  Methods / techniques / tools applied to learn about vulnerabilities
o  Methods / techniques to learn about impact on systems
o  Methods / techniques community involvement
o  Main uncertainties / challenges encountered
·        Related to the decision making process of adaptive planning
o  (structural) barriers encountered through the implementation process

4.5  Dissemination and upscaling of pilot results

[null 4.6 Transnational] exchange

·        Protection

·        Pro-action/prevention

·        Preparedness & response

·        Recovery

[null 5.    References]



}

























Country: The Netherlands
Coordinate 51° 52' 23.99" N, 4° 48' 2.99" E
Pilot manager authority: Province of Zuid Holland
Objective:
  • A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS.
  • By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved.
  • How can citizens / volunteer organizations play a role in emergency response?
Flood risk: Riverine.

The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level.

Stakeholder(s):
Bezig met het laden van de kaart...