FR PLT PR 00001: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 8: Regel 8:
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/04/30
|End date=2020/04/30
|Summary=The aim  is to apply MLS is to test the potential of natural management solutions to improve protection and involving landowners, communities and partners in developing solutions (flood groups and local action plans)  together to improve preparedness
|Summary=Building community resilience is about involving the wider community and not just those that have been flooded, as everyone has a role to play in reducing flood risk. Flooding events can have negative impacts on anyone. Therefore, the aim of this pilot scheme is to help a whole community prepare for a flooding event, as it is believed that, the more one is prepared, the easier it is to recover from such an traumatic event.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
Regel 27: Regel 27:
|Coordinate=53.0793913, -0.95617770000001
|Coordinate=53.0793913, -0.95617770000001
|Pilot manager authority=Trent Rivers Trust
|Pilot manager authority=Trent Rivers Trust
|Objective=* Modeling and mapping of potential natural flood management solutions
|Objective=In this pilot,  MLS will be applied to test the potential of natural management solutions to improve flood risk management. By involving landowners, communities and partners, solutions will be thought of together, and this will help to improve overall preparedness.
 
|Flood risk=Fluvial.
* Develop solutions with landowners, communities and partners
Southwell itself sits within a ‘basin’; when rainfall is particularly heavy or when there is a period of flash flooding, the surface water runs off the hills and roads into the bottom of the basin, overwhelming the drainage system and creating pockets of flooding.
 
* Design and deliver solutions to reduce risk
 
* Support existing flood group to develop local action plan
|Flood risk=Riverine and sea.
|Target=1 - 6.000 inhabitants
|Target=1 - 6.000 inhabitants
2 - 8 NG-stakeholders targeting 500 inhabitants
2 - 8 NG-stakeholders targeting 500 inhabitants
}}
}}

Versie van 24 sep 2019 08:24



}

























Country: United Kingdom
Coordinate 53° 4' 45.81" N, 0° 57' 22.24" W
Pilot manager authority: Trent Rivers Trust
Objective: In this pilot, MLS will be applied to test the potential of natural management solutions to improve flood risk management. By involving landowners, communities and partners, solutions will be thought of together, and this will help to improve overall preparedness.
Flood risk: Fluvial.

Southwell itself sits within a ‘basin’; when rainfall is particularly heavy or when there is a period of flash flooding, the surface water runs off the hills and roads into the bottom of the basin, overwhelming the drainage system and creating pockets of flooding.

Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen