FR PLT PR 00009: verschil tussen versies

Geen bewerkingssamenvatting
k (Tekst vervangen - "{{Project" door " {{Project")
 
(9 tussenliggende versies door 6 gebruikers niet weergegeven)
Regel 1: Regel 1:


{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00069
|Supercontext=PR 00266
|Project type=FR PLT,  FR WP,  Standaard
|Project type=FR PLT,  FR WP,  Standaard
|Topcontext=PR 00069
|Topcontext=PR 00069
|Name=Wesermarch (DE)
|Name=Wesermarsch
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=Improving and using risk and hazards maps to allow for contingency planning and exercises, with a special focus on rural and urban drainage. The improved database will be tested for improving resilience. Pilot Book attached for more detail.
|Summary=The overall goal is to strengthen layers 2 and 3 and providing the actors with useful  outcomes to get more balanced FRM strategies in the Wesermarsch region. The long term goal is to motivate and/or stimulate actors to continue with the same activities/line of work.
|Show summary=Ja
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
|Show sub projects=Ja
|Show new page button=Ja
|Show participants=Ja
|Show sub projects=Nee
|Show sources=Ja
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
|FR_PLT_additional_Target=1 - 89.000 inhabitants
2 - 20 regional fora
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Objective=* Contingency planning workshops with regional stakeholders (layer 2 and 3)
|Country=Germany
|Coordinate=53.4030919, 8.4565113
|Pilot manager authority=Jade University of Applied Sciences
|Objective=* To increase public awareness and preparedness regarding floods to minimize subsequent damage
* To unveil shortcomings by reviewing mechanisms concerning disaster management from  individual preparations up to the request of national or international auxiliary forces
* To link stakeholders (governmental and non-governmental) which are involved in disaster management to share problems and ideas and interactively develop solutions / strategies
* To improve spatial planning / adaptation in terms of building flood resilience
|Flood risk=Riverine, rainfall and sea flooding.


* Contingency plan, spatial plan and exercises for flood prone areas
The flood hazard level is considered 1, not harmful.


* Smart linking of urban and rural drainage
In case of a storm surge with dike breaches, impacts are high (because area is low-lying and would be flooded quickly); in case of river or/and rainfall flooding the impacts are rather small scale / very localized.
|Target=1 - 89.000 inhabitants
|Target=1 - 89.000 inhabitants
2 - 20 regional fora
2 - 20 regional fora
}}
}}

Huidige versie van 25 mrt 2024 om 10:51




}


























Country: Germany
Coordinate 53° 24' 11.13" N, 8° 27' 23.44" E
Pilot manager authority: Jade University of Applied Sciences
Objective:
  • To increase public awareness and preparedness regarding floods to minimize subsequent damage
  • To unveil shortcomings by reviewing mechanisms concerning disaster management from individual preparations up to the request of national or international auxiliary forces
  • To link stakeholders (governmental and non-governmental) which are involved in disaster management to share problems and ideas and interactively develop solutions / strategies
  • To improve spatial planning / adaptation in terms of building flood resilience
Flood risk: Riverine, rainfall and sea flooding.

The flood hazard level is considered 1, not harmful.

In case of a storm surge with dike breaches, impacts are high (because area is low-lying and would be flooded quickly); in case of river or/and rainfall flooding the impacts are rather small scale / very localized.

Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen