FR PLT PR 00016: verschil tussen versies
Geen bewerkingssamenvatting |
k (Tekst vervangen - "{{Project" door " {{Project") |
||
(Een tussenliggende versie door een andere gebruiker niet weergegeven) | |||
Regel 1: | Regel 1: | ||
{{Project FR PLT config}} | {{Project FR PLT config}} | ||
{{Project | {{Project | ||
|Supercontext=PR_00266 | |Supercontext=PR_00266 | ||
Regel 7: | Regel 9: | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/07/31 | |End date=2020/07/31 | ||
|Summary=The Medway FRAMES project is focused on increasing environmental resilience to flooding.Nature-based solutions are a new approach in this pilot area, and show promise as they can be applied in the many areas of the catchment where technical or landscape designation restrictions means that there is limited scope for traditional hard engineering approaches. | |Summary=The Medway FRAMES project is focused on increasing environmental resilience to flooding. Nature-based solutions are a new approach in this pilot area, and show promise as they can be applied in the many areas of the catchment where technical or landscape designation restrictions means that there is limited scope for traditional hard engineering approaches. | ||
|Show summary=Nee | |Show summary=Nee | ||
|Show navigation tree=Ja | |Show navigation tree=Ja | ||
Regel 20: | Regel 22: | ||
|Show title=Ja | |Show title=Ja | ||
}} | }} | ||
{{Project FR PLT additional | {{Project FR PLT additional | ||
|Country=United Kingdom | |Country=United Kingdom |
Huidige versie van 25 mrt 2024 om 10:51