FR PLT PR 00011: verschil tussen versies

Geen bewerkingssamenvatting
k (Tekst vervangen - "{{Project" door " {{Project")
 
(18 tussenliggende versies door 9 gebruikers niet weergegeven)
Regel 1: Regel 1:


{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00069
|Supercontext=PR 00266
|Project type=FR PLT,  FR WP,  Standaard
|Project type=FR PLT,  FR WP,  Standaard
|Topcontext=PR 00069
|Topcontext=PR 00069
|Name=Denderleeuw (BE)
|Name=Denderleeuw
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=- Setup of self-relational actor-networks using urban site as Urban Water Livings Labs
|Summary=The main of  this pilot is to increase the capacities of local organisations / institutions and communities, but the project will also unite relevant local stakeholders to address the flood vulnerability of the entire neighbourhood, including the physical resilience of potential future building developments.  The project intends to contribute to a better cooperation between local authorities.
|Show summary=Nee
|Show navigation tree=Ja
|Show new page button=Ja
|Show sub projects=Nee
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
|FR_PLT_additional_Target=1 - 15.000 inhabitants
2 - 100 workers / 15 stakeholders
|FR_PLT_additional_Responsible person=Gebruiker:Btempels,Hannelore Mees
|FR_PLT_additional_Participant=Ghent University,Provincie Oost-Vlaanderen
}}


- Identification of key stakeholders for self-reliant water management
{{Project FR PLT additional
 
|Country=Belgium
- Realisation of shared stakeholder method for self-reliant water management (layer 3 and 4)
|Coordinate=50.8831041, 4.0809779
|Pilot manager authority=* Province of East Flanders
* Ghent University
|Objective=The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
|Flood risk=Fluvial.


- Adoptable model of bottom-up flood prone area as a living lab approach
The Dender has naturally a quick hydrological response because of the loam soils in the uphill zones. In case of intense rainfall, the river response is relatively quickly, increasing its level. Furthermore, the Dender Basin has been subject to land sealing through urbanization enhancing this process.
}}
{{Project FR PLT additional
|Target=1 - 15.000 inhabitants
|Target=1 - 15.000 inhabitants
2 - 100 workers / 15 stakeholders
2 - 100 workers / 15 stakeholders
|Responsible person=Gebruiker:Btempels,Hannelore Mees
|Participant=Ghent University,Provincie Oost-Vlaanderen
}}
}}

Huidige versie van 25 mrt 2024 om 10:51




}


























Country: Belgium
Coordinate 50° 52' 59.17" N, 4° 4' 51.52" E
Pilot manager authority:
  • Province of East Flanders
  • Ghent University
Objective: The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
Flood risk: Fluvial.

The Dender has naturally a quick hydrological response because of the loam soils in the uphill zones. In case of intense rainfall, the river response is relatively quickly, increasing its level. Furthermore, the Dender Basin has been subject to land sealing through urbanization enhancing this process.

Stakeholder(s):