FR PLT PR 00006: verschil tussen versies

Geen bewerkingssamenvatting
k (Tekst vervangen - "{{Project" door " {{Project")
 
(6 tussenliggende versies door een andere gebruiker niet weergegeven)
Regel 1: Regel 1:
==Pilot objective/goal==
 
The aim was to better understand the vulnerability (including cascading effects) of the electricity supply network (medium and low voltage) in Zeeland and recommend robust spatial measures to make it more flood proof ({{Cite|resource=Bestand:Eindrapport Frames Zeeland English version def.pdf|name=Nelen & Schuurmans, 2018|dialog=process-file-dialog}}). Thus, the main focus of the pilot is on Layer 2 (spatial planning) benefiting Layer 3 (crisis management) of the MLS approach.
 
{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00266
|Supercontext=PR 00266
Regel 8: Regel 9:
|Name=Flood Proof Electricity Grid Zeeland
|Name=Flood Proof Electricity Grid Zeeland
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively.
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively.
|Show summary=Nee
|Show summary=Nee
Regel 21: Regel 22:
|Show category label=Nee
|Show category label=Nee
|Show title=Ja
|Show title=Ja
|FR_PLT_additional_Target=1 - 381.182 inhabitants
2 - 1 electricity grid operator
|FR_PLT_additional_Responsible person=CNTR 00110
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Country=The Netherlands
|Country=The Netherlands
|Coordinate=51.4989236, 3.6110654
|Coordinate=51.4989236, 3.6110654
|Pilot manager authority=Province of Zeeland
|Pilot manager authority=Province of Zeeland
|Objective=Inventory of requirements for a flood proof electricity grid  
|Objective=* Inventory of requirements for a flood proof electricity grid;
Flood proof grid spatial planning measures (layer 2)  
* Flood proof grid spatial planning measures (layer 2), and
Duplicable spatial measures model for resilient NSR electricity grids
* Duplicable spatial measures model for resilient NSR electricity grids
|Flood risk=Sea flooding
|Flood risk=Sea flooding
|Target=1 - 381.182 inhabitants
2 - 1 electricity grid operator
|Responsible person=CNTR 00110
}}
}}

Huidige versie van 25 mrt 2024 om 10:51




}


























Country: The Netherlands
Coordinate 51° 29' 56.12" N, 3° 36' 39.84" E
Pilot manager authority: Province of Zeeland
Objective:
  • Inventory of requirements for a flood proof electricity grid;
  • Flood proof grid spatial planning measures (layer 2), and
  • Duplicable spatial measures model for resilient NSR electricity grids
Flood risk: Sea flooding
Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen