FR PLT PR 00006: verschil tussen versies

Geen bewerkingssamenvatting
k (Tekst vervangen - "{{Project" door " {{Project")
 
(37 tussenliggende versies door 4 gebruikers niet weergegeven)
Regel 1: Regel 1:
==1. Pilot description==
 
===1.1 Pilot manager authority===
 
===1.2 Pilot location===
===1.3 Area description===
===1.4 Flood risks===
==2. Pilot objective/goal==
==3. Implementation process==
===3.1 Point of departure of FRM strategies===
===3.2 Key actors===
===3.3 Main activities===
==4. Project outcomes and beyond==
===4.1   Main outcomes===
===4.2  Key actors and their roles===
===4.3  Flood risk management strategies (FRMS)===
===4.4   Lessons learnt so far===
====·        Knowledge needs for flood resilience:====
====·        Related to content:====
=====o  ''Applying MLS approach''=====
=====o  ''Methods / techniques / tools applied to learn about vulnerabilities''=====
=====o  ''Methods / techniques to learn about impact on systems''=====
=====o  ''Methods / techniques community involvement''=====
=====o  Main uncertainties / challenges encountered=====
=====·        Related to the decision making process of adaptive planning=====
=====o  ''(structural) barriers encountered through the implementation process''=====
===4.5  Dissemination and upscaling of pilot results===
===4.6 Transnational exchange===
====·        Protection====
====·        Pro-action/prevention====
====·        Preparedness & response====
====·        Recovery====
==5.    References==
{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00266
|Supercontext=PR 00266
Regel 37: Regel 9:
|Name=Flood Proof Electricity Grid Zeeland
|Name=Flood Proof Electricity Grid Zeeland
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively.
|Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Nee
|Show navigation tree=Ja
|Show new page button=Nee
|Show new page button=Ja
|Show sub projects=Nee
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
Regel 50: Regel 22:
|Show category label=Nee
|Show category label=Nee
|Show title=Ja
|Show title=Ja
|FR_PLT_additional_Target=1 - 381.182 inhabitants
2 - 1 electricity grid operator
|FR_PLT_additional_Responsible person=CNTR 00110
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Country=The Netherlands
|Country=The Netherlands
|Coordinate=51.4989236, 3.6110654
|Coordinate=51.4989236, 3.6110654
|Pilot manager authority=Province of Zeeland
|Pilot manager authority=Province of Zeeland
|Objective=- Inventory of requirements for a flood proof electricity grid  
|Objective=* Inventory of requirements for a flood proof electricity grid;
- Flood proof grid spatial planning measures (layer 2)  
* Flood proof grid spatial planning measures (layer 2), and
- Duplicable spatial measures model for resilient NSR electricity grids
* Duplicable spatial measures model for resilient NSR electricity grids
|Flood risk=Sea flooding
|Flood risk=Sea flooding
|Target=1 - 381.182 inhabitants
2 - 1 electricity grid operator
|Responsible person=CNTR 00110
}}
}}

Huidige versie van 25 mrt 2024 om 10:51




}


























Country: The Netherlands
Coordinate 51° 29' 56.12" N, 3° 36' 39.84" E
Pilot manager authority: Province of Zeeland
Objective:
  • Inventory of requirements for a flood proof electricity grid;
  • Flood proof grid spatial planning measures (layer 2), and
  • Duplicable spatial measures model for resilient NSR electricity grids
Flood risk: Sea flooding
Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen