FR PLT PR 00006: verschil tussen versies
Geen bewerkingssamenvatting |
k (Tekst vervangen - "{{Project" door " {{Project") |
||
(48 tussenliggende versies door 6 gebruikers niet weergegeven) | |||
Regel 1: | Regel 1: | ||
{{Project FR PLT config}} | {{Project FR PLT config}} | ||
{{Project | {{Project | ||
|Supercontext=PR 00266 | |Supercontext=PR 00266 | ||
|Project type=FR PLT, FR WP, Standaard | |Project type=FR PLT, FR WP, Standaard | ||
|Topcontext=PR 00069 | |Topcontext=PR 00069 | ||
|Name=Flood Proof Electricity Grid Zeeland | |Name=Flood Proof Electricity Grid Zeeland | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/ | |End date=2020/07/31 | ||
|Summary= | |Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively. | ||
|Show summary= | |Show summary=Nee | ||
|Show navigation tree=Ja | |Show navigation tree=Ja | ||
| | |Show new page button=Ja | ||
|Show | |Show sub projects=Nee | ||
|Show | |Show participants=Nee | ||
|Show | |Show sources=Nee | ||
|Show | |Is homepage=Nee | ||
|Show edit button=Nee | |||
|Show VE button=Ja | |||
|Show category label=Nee | |||
|Show title=Ja | |||
}} | }} | ||
{{Project FR PLT additional | {{Project FR PLT additional | ||
|Country=The Netherlands | |Country=The Netherlands | ||
|Objective=* Inventory of requirements for a flood proof electricity grid | |Coordinate=51.4989236, 3.6110654 | ||
* Flood proof grid spatial planning measures (layer 2) | |Pilot manager authority=Province of Zeeland | ||
|Objective=* Inventory of requirements for a flood proof electricity grid; | |||
* Flood proof grid spatial planning measures (layer 2), and | |||
* Duplicable spatial measures model for resilient NSR electricity grids | * Duplicable spatial measures model for resilient NSR electricity grids | ||
| | |Flood risk=Sea flooding | ||
}} | }} |
Huidige versie van 25 mrt 2024 om 10:51