FR PLT PR 00002: verschil tussen versies

Geen bewerkingssamenvatting
k (Tekst vervangen - "{{Project" door " {{Project")
 
(23 tussenliggende versies door 7 gebruikers niet weergegeven)
Regel 1: Regel 1:


{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00069
|Supercontext=PR 00266
|Project type=FR PLT,  FR WP,  Standaard
|Project type=FR PLT,  FR WP,  Standaard
|Topcontext=PR 00069
|Topcontext=PR 00069
|Name=Reimerswaal (NL)
|Name=Reimerswaal
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=- Mapping of vital infrastructure (roads, rail, electricity) that submerges during a flood
|Summary=The Multi-Layer Safety concept looks at the consequences of a possible flooding. This project will specifically address the following question:  What impact does a flood have on our vital infrastructure?The goal of the project is to develop a better integral insight in making the electricity supply network flood resilient. To this end, insight will first be provided into the most vulnerable electricity sets. Subsequently, measures will be derived to increase the robustness.
|Show summary=Nee
|Show navigation tree=Ja
|Show new page button=Ja
|Show sub projects=Nee
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
}}


- Inventory of submergence preventive spatial measures - cost / effectiveness - (layer 2)
- Adoptable (GIS) tool with submergence preventive measures for flood prone region
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Target=: 1 - 22.260 inhabitants
|Country=The Netherlands
2 - 2 infrastructure operators
|Coordinate=51.451682659253, 4.0390957544922
|Responsible person=CNTR 00110
|Pilot manager authority=Province of Zeeland
|Participant=Pieter Ton
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
}}
}}

Huidige versie van 25 mrt 2024 om 10:51




}


























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen