|FR_PLT_additional_Target=1 - 22.260 inhabitants
2 - 2 infrastructure operators
|FR_PLT_additional_Responsible person=CNTR 00110,Pieter Ton
|FR_PLT_additional_Participant=Veiligheidsregio Zeeland,Rijkswaterstaat Zee en Delta,Provincie Zeeland,Municipality of Reimerswaal,HZ University of Applied Sciences,Waterschelde Scheldestromen
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
Regel 31: Regel 27:
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
|Target=1 - 22.260 inhabitants
2 - 2 infrastructure operators
|Responsible person=CNTR 00110,Pieter Ton
|Participant=Veiligheidsregio Zeeland,Rijkswaterstaat Zee en Delta,Provincie Zeeland,Municipality of Reimerswaal,HZ University of Applied Sciences,Waterschelde Scheldestromen
}}
}}

Versie van 30 jun 2020 15:21



}

























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
Stakeholder(s):