|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/07/31
|End date=2020/07/31
|Summary=There is a general lack of knowledge about the vulnerability of vital infrastructure to floods in the Netherlands. The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (L2) to flood defence measures (L1) to decrease the vulnerability of vital infrastructure (interview with pilot manager, 2019).
|Summary=The Multi-Layer Safety concept looks at the consequences of a possible flooding. This project will specifically address the following question:  What impact does a flood have on our vital infrastructure?The goal of the project is to develop a better integral insight in making the electricity supply network flood resilient. To this end, insight will first be provided into the most vulnerable electricity sets. Subsequently, measures will be derived to increase the robustness.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
Regel 29: Regel 29:
|Coordinate=51.451682659253, 4.0390957544922
|Coordinate=51.451682659253, 4.0390957544922
|Pilot manager authority=Province of Zeeland
|Pilot manager authority=Province of Zeeland
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (L2) to flood defence measures (L1) to decrease the vulnerability of vital infrastructure (interview with pilot manager, 2019).
|Objective=The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
|Target=1 - 22.260 inhabitants
|Target=1 - 22.260 inhabitants

Versie van 30 jun 2020 15:21



}

























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).