Regel 8: | Regel 8: | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/01/31 | |End date=2020/01/31 | ||
|Summary=There is a general lack of knowledge about the vulnerability of vital infrastructure to floods in the Netherlands. The overall goal of the pilot is to change the way policy makers | |Summary=There is a general lack of knowledge about the vulnerability of vital infrastructure to floods in the Netherlands. The overall goal of the pilot is to change the way of thinking of everybody (policy makers, inhabitants) related to water safety adding spatial adaptation measures (L2) to flood defence (L1) measures to deal with vulnerability of vital infrastructure (pers. comm. pilot manager, 2019). | ||
|Show summary=Nee | |Show summary=Nee | ||
|Show navigation tree=Ja | |Show navigation tree=Ja | ||
Regel 29: | Regel 29: | ||
|Coordinate=51.451682659253, 4.0390957544922 | |Coordinate=51.451682659253, 4.0390957544922 | ||
|Pilot manager authority=Province of Zeeland | |Pilot manager authority=Province of Zeeland | ||
|Objective= | |Objective=The overall goal of the pilot is to change the way of thinking of everybody (policy makers, inhabitants) related to water safety adding spatial adaptation measures (L2) to flood defence (L1) measures to deal with vulnerability of vital infrastructure (pers. comm. pilot manager, 2019). | ||
|Flood risk=Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (pers. comm. pilot manager, 2019). | |||
|Flood risk=Sea flooding | |||
|Target=1 - 22.260 inhabitants | |Target=1 - 22.260 inhabitants | ||
2 - 2 infrastructure operators | 2 - 2 infrastructure operators |