FR PLT PR 00006: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 13: Regel 13:
|Show navigation tree=Ja
|Show navigation tree=Ja
|Show new page button=Ja
|Show new page button=Ja
|Show sub projects=Ja
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
|Show sources=Nee
|Show sources=Nee

Versie van 27 mrt 2019 10:49

Pilot objective/goal

The aim was to better understand the vulnerability (including cascading effects) of the electricity supply network (medium and low voltage) in Zeeland and recommend robust spatial measures to make it more flood proof (Nelen & Schuurmans, 2018). Thus, the main focus of the pilot is on Layer 2 (spatial planning) benefiting Layer 3 (crisis management) of the MLS approach.



}

























Country: The Netherlands
Coordinate 51° 29' 56.12" N, 3° 36' 39.84" E
Pilot manager authority: Province of Zeeland
Objective:
  • Inventory of requirements for a flood proof electricity grid;
  • Flood proof grid spatial planning measures (layer 2), and
  • Duplicable spatial measures model for resilient NSR electricity grids
Flood risk: Sea flooding
Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen