FR PLT PR 00004: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 1: Regel 1:
== 1. Pilot description ==
== 1. Pilot description ==


=== [null 1.1] Pilot manager authority ===
=== 1.1 Pilot manager authority ===


=== [null 1.2 Pilot location] ===
=== 1.2 Pilot location ===


=== 1.3 Area description ===
=== 1.3 Area description ===
Regel 9: Regel 9:
=== 1.4 Flood risks ===
=== 1.4 Flood risks ===


== 2. [null Pilot] objective/goal ==
== 2. Pilot objective/goal ==


== 3. [null Implementation process] ==
== 3. Implementation process ==


=== 3.1 Point of departure of FRM strategies ===
=== 3.1 Point of departure of FRM strategies ===
Regel 19: Regel 19:
=== 3.3 Main activities ===
=== 3.3 Main activities ===


== [null 4. Project outcomes and beyond] ==
== 4. Project outcomes and beyond ==


=== [null 4.1   Main outcomes] ===
=== 4.1   Main outcomes ===


=== 4.2  Key actors and their roles ===
=== 4.2  Key actors and their roles ===
Regel 27: Regel 27:
=== 4.3  Flood risk management strategies (FRMS) ===
=== 4.3  Flood risk management strategies (FRMS) ===


=== [null 4.4   Lessons learnt so far] ===
=== 4.4   Lessons learnt so far ===


==== ·        Knowledge needs for flood resilience: ====
==== ·        Knowledge needs for flood resilience: ====
Regel 49: Regel 49:
=== 4.5  Dissemination and upscaling of pilot results ===
=== 4.5  Dissemination and upscaling of pilot results ===


=== [null 4.6 Transnational] exchange ===
=== 4.6 Transnational exchange ===


==== ·        Protection ====
==== ·        Protection ====
Regel 59: Regel 59:
==== ·        Recovery ====
==== ·        Recovery ====


== [null 5.    References] ==
== 5.    References ==
 
 





Versie van 21 mrt 2019 10:18

1. Pilot description

1.1 Pilot manager authority

1.2 Pilot location

1.3 Area description

1.4 Flood risks

2. Pilot objective/goal

3. Implementation process

3.1 Point of departure of FRM strategies

3.2 Key actors

3.3 Main activities

4. Project outcomes and beyond

4.1   Main outcomes

4.2  Key actors and their roles

4.3  Flood risk management strategies (FRMS)

4.4   Lessons learnt so far

·        Knowledge needs for flood resilience:

·        Related to content:

o  Applying MLS approach
o  Methods / techniques / tools applied to learn about vulnerabilities
o  Methods / techniques to learn about impact on systems
o  Methods / techniques community involvement
o  Main uncertainties / challenges encountered
·        Related to the decision making process of adaptive planning
o  (structural) barriers encountered through the implementation process

4.5  Dissemination and upscaling of pilot results

4.6 Transnational exchange

·        Protection

·        Pro-action/prevention

·        Preparedness & response

·        Recovery

5.    References



}

























Country: The Netherlands
Coordinate 51° 52' 23.99" N, 4° 48' 2.99" E
Pilot manager authority: Province of Zuid Holland
Objective:
  • A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS.
  • By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved.
  • How can citizens / volunteer organizations play a role in emergency response?
Flood risk: Riverine.

The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level.

Stakeholder(s):
Bezig met het laden van de kaart...