FR PLT PR 00002: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 8: Regel 8:
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/01/31
|Summary=Assessing the impact of floods in flood prone areas where infrastructure is concentrated (roads/tunnels/rail) and next developing MLS spatial solutions including a flood-proof electricity grid that mitigates the effects of floods (cost) effectively.
|Summary=There is a general lack of knowledge about the vulnerability of vital infrastructure to floods in the Netherlands. The overall goal of the pilot is to change the way policy makers ánd inhabitants thinks about water safety by adding spatial adaptation measures to flood defence measures to deal with the vulnerability of vital infrastructures.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Nee
|Show navigation tree=Nee
Regel 28: Regel 28:
|Country=The Netherlands
|Country=The Netherlands
|Coordinate=51.451682659253, 4.0390957544922
|Coordinate=51.451682659253, 4.0390957544922
|Pilot manager authority=Province of Zeeland
|Objective=* Mapping of vital infrastructure (roads, rail, electricity) that submerges during a flood
|Objective=* Mapping of vital infrastructure (roads, rail, electricity) that submerges during a flood
* Inventory of submergence preventive spatial measures - cost / effectiveness - (layer 2)
* Inventory of submergence preventive spatial measures - cost / effectiveness - (layer 2)
* Adoptable (GIS) tool with submergence preventive measures for flood prone region
* Adoptable (GIS) tool with submergence preventive measures for flood prone region
|Flood risk=Sea flooding (low probability)
|Target=1 - 22.260 inhabitants
|Target=1 - 22.260 inhabitants
2 - 2 infrastructure operators
2 - 2 infrastructure operators

Versie van 14 mrt 2019 13:35



}

























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
Stakeholder(s):
Bezig met het laden van de kaart...