FR PLT PR 00006: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
Regel 8: | Regel 8: | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/01/31 | |End date=2020/01/31 | ||
|Summary= | |Summary=In this pilot, the province of Zeeland will assess the impact of floods in flood prone areas where a concentration of infrastructures, such as roads, tunnels and rails, can be found. We aim to develop spatial solutions based on the MLS-approach that will include a flood-proof electricity grid that will mitigate the effects of floods (cost-)effectively. | ||
|Show summary=Nee | |Show summary=Nee | ||
|Show navigation tree=Nee | |Show navigation tree=Nee | ||
Regel 28: | Regel 28: | ||
|Coordinate=51.4989236, 3.6110654 | |Coordinate=51.4989236, 3.6110654 | ||
|Pilot manager authority=Province of Zeeland | |Pilot manager authority=Province of Zeeland | ||
|Objective=- Inventory of requirements for a flood proof electricity grid | |||
- Flood proof grid spatial planning measures (layer 2) | |||
- Duplicable spatial measures model for resilient NSR electricity grids | |||
|Objective= | |Flood risk=Sea flooding | ||
|Stakeholder=• Province of Zeeland • Waterboard Scheldestromen • Municipality Hulst • Ministry of Infrastructure & Environment • TenneT • Enduris • Veiligheidsregio Zeeland (Zeeland Safety Region) • Nelen&Schuurmans (consultancy firm), | |||
|Target=1 - 381.182 inhabitants | |Target=1 - 381.182 inhabitants | ||
2 - 1 electricity grid operator | 2 - 1 electricity grid operator | ||
|Responsible person=CNTR 00110 | |Responsible person=CNTR 00110 | ||
}} | }} |