FR PLT PR 00002: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 10: Regel 10:
|Summary=Assessing the impact of floods in flood prone areas where infrastructure is concentrated (roads/tunnels/rail) and next developing MLS spatial solutions including a flood-proof electricity grid that mitigates the effects of floods (cost) effectively.
|Summary=Assessing the impact of floods in flood prone areas where infrastructure is concentrated (roads/tunnels/rail) and next developing MLS spatial solutions including a flood-proof electricity grid that mitigates the effects of floods (cost) effectively.
https://www.projectenportfolio.nl/wiki/index.php/FR_PLT_PR_00005
https://www.projectenportfolio.nl/wiki/index.php/FR_PLT_PR_00005
|Show summary=Nee
|Show navigation tree=Nee
|Show new page button=Nee
|Show sub projects=Nee
|Show participants=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Ja
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional

Versie van 15 feb 2019 15:32



}

























Country: The Netherlands
Coordinate 51° 27' 6.06" N, 4° 2' 20.74" E
Pilot manager authority: Province of Zeeland
Objective: The overall goal of this pilot is to change the way policy makers and inhabitants think about adding spatial adaptation measures (layer 2) to flood defence measures (layer 1) to decrease the vulnerability of vital infrastructure.
Flood risk: Sea flooding; very low probability(>1:1000 years), flood return period 1:4000 years (interview with pilot manager, 2019).
Stakeholder(s):
Bezig met het laden van de kaart...