FR PLT PR 00004: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Label: Handmatige ongedaanmaking
 
(30 tussenliggende versies door 7 gebruikers niet weergegeven)
Regel 1: Regel 1:


{{Project FR PLT config}}
{{Project FR PLT config}}
{{Project
{{Project
|Supercontext=PR 00069
|Supercontext=PR 00266
|Project type=FR PLT,  FR WP,  Standaard
|Project type=FR PLT,  FR WP,  Standaard
|Topcontext=PR 00069
|Topcontext=PR 00069
|Name=Alblasserwaard (NL)
|Name=Alblasserwaard - Vijfheerenlanden
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=Joint execution with stakeholders of spatial catchment-based measures within 4 catchment areas to demonstrate cross-sector benefits and increase resilience for: communities, agriculture, businesses, cultural capital (e.g. UNESCO site).
|Summary=Flood risk management strategies in the Netherlands focuses on flood prevention and less on the other layers of MLS. The responsibility for the different layers lies with different governments. Everyone takes their responsibility, but do we not miss opportunities by connecting the layers?
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
|Create process and content pages=Nee
|Show new page button=Ja
|Show new page button=Ja
|Show sub projects=Ja
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
|Show sources=Ja
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Nee
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
|FR_PLT_additional_Target=1 - 300.000 inhabitants
2 - 10 communities
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Objective=* Combining spatial/economic planning with reduction of effects of flooding
|Country=The Netherlands
* Adopt evacuation models
|Coordinate=51.873331, 4.800831
* Calculation models and spatial plans that integrate evacuation
|Pilot manager authority=Province of Zuid Holland
|Objective=* A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS.
* By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved.
* How can citizens / volunteer organizations play a role in emergency response?
|Flood risk=Riverine.
 
The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level.
|Target=1 - 300.000 inhabitants
|Target=1 - 300.000 inhabitants
2 - 10 communities
2 - 10 communities
|Coordinate=51.8617201, 4.658131
}}
}}

Huidige versie van 27 mei 2024 om 10:48




}


























Country: The Netherlands
Coordinate 51° 52' 23.99" N, 4° 48' 2.99" E
Pilot manager authority: Province of Zuid Holland
Objective:
  • A literature study will be carried out to create a shared view on MLS. This will also pinpoint any knowledge gaps in the different layers of MLS.
  • By combining evacuation (layer 3) with spatial development (layer 2), emergency management can be improved.
  • How can citizens / volunteer organizations play a role in emergency response?
Flood risk: Riverine.

The Alblasserwaard-Vijfheerenlanden tilts from east to west and lies two meters below sea level. During flood event, water levels can rise 4 meters above elevation level.

Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen