Orientation phase Schorerpolder

Start project

Visitors at the meeting during the poster presentation.

On the first of February 2018, the project started to map different alternative designs based on previous studies and outcomes of new studies. Two researchers of the Building with Nature group of HZ coordinated this research and guided the involved students. The expertise of researchers of water safety and spatial planning, civil engineering and vitality and tourism was added. A stakeholder meeting was organised the 14th of June in the former town hall of Middelburg to share the outcomes of the first six months and to organize discussion about the different alternative designs.

Ecosystem services

Groups of students compared the alternative designs for ecosystem services (click for infographic):

  1. Sustainable use of abiotic resources (Sinke et al. 2018)
  2. Use as a nursery for fish (Lee et al. 2018)
  3. Provision of habitat and foraging area for birds (Burger et al. 2018)
  4. Enhance the biodiversity of hard structures in the intertidal zone of the area (Metekohij et al. 2018)
  5. Quantification of primary production and carbon dioxide sequestration (Mol et al. 2018)
  6. Quantification of the water purification capacity of salt marshes (Correa et al. 2018)
  7. Possibilities for aquaculture (Abbenis, 2018)
  8. Opportunities for experiencing nature and tourism (Kruizinga 2018)

Limits and opportunities

The possibilities for Schorerpolder are limited because of its location, what is to be found below and above the surface and where it is currently used for. The layer approach was used to define the spatial impact of the area. The most important outcome of the research was the amount of cables and tubes that where present in the area, all of importance to the harbor (Lambregts, 2018).

Figure 1: Four alternative designs for Schorerpolder.

Designs

The four different designs of Schorerpolder, were assessed based on the ecosystem services and expenses on creation and maintenance.

  • Open connection: Opening up the polder completely would allow for natural processes that make intertidal areas so unique to shape and form the area. By letting these tides flow through the area unhindered the potential intertidal area is maximized which is beneficial for wading birds but downside is that all dikes would have to be overhauled.
  • Controlled tide: This design needs less changes in the primary dike than the previous one and is beneficial as fish nursery (e.g. eel) because of the presence of a gully and denitrification can occur in anaerobic environments. In addition salt marshes can develop more easily and can store CO2.
  • Separated functions: This design is expensive as a new dam will be built to separate the harbor from the new intertidal area. Still this leads to opportunities for biodiversity on dams and dikes. The high sedimentation rate will lead to phosphorus burial and options to use the sediment as abiotic resource.
  • Combined perspectives: By combining low costs and maximizing ecosystem services, the fourth design was born. In addition this design makes aquaculture possible.

Conclusion

The interactive meeting showed that the majority of the stakeholders were in favor of designs controlled tide and combined perspectives. Further research needs to be done on CO2 reduction capacity of salt marshes.























Referenties